[1]
Talukder, N.R. 2026. Risk-based Project Scheduling Model of Large-scale Renewable Power Plant Constructions through Monte Carlo Simulation. International Journal of Applied and Natural Sciences. 4, 1 (Mar. 2026), 54–68. DOI:https://doi.org/10.61424/ijans.v4i1.741.