Talukder, N. R. (2026). Risk-based Project Scheduling Model of Large-scale Renewable Power Plant Constructions through Monte Carlo Simulation. International Journal of Applied and Natural Sciences, 4(1), 54–68. https://doi.org/10.61424/ijans.v4i1.741